Ce site requiert JavaScript pour fonctionner.
Veuillez activer JavaScript dans votre navigateur.
Patch 10.2.5 Now An Encrypted Vendor Build
RPT
Publié
27/10/2023 à 10:49
par
Anshlun
With BlizzCon next week and Patch 10.2 being only 11 days away, it doesn't seem Blizzard has plans to stop their PTR cadence as they've just updated one of their PTRs to Patch 10.2.5.
This follows previous PTR updates that usually show up on encrypted branches a week or so before the previous patch is released. This likely means we will hear more about 10.2.5 during BlizzCon next week.
This is also the first patch not present in Blizzard's roadmap, so we don't know what to expect!
S'abonner à Wowhead
Premium
2 $US
Un mois
[Enjoy an ad-free experience, unlock premium features, & support the site!]
Afficher les 0 commentaires
Masquer les 0 commentaires
Connectez-vous pour laisser un commentaire
Commentaire Anglais (18)
Poster un commentaire
Vous n'êtes pas connecté(e). Veuillez vous
connecter
ou vous
inscrire
pour ajouter votre commentaire.
Message précédent
Message suivant